Start with the number: China's lighting exports reached USD 49.9 billion in 2025, down 11.2% year on year, and the average export price of an LED bulb fell from USD 1.29 a decade ago to USD 0.46. There is no room left in price. Whether an LED export site produces inquiries now depends on one thing: can the buyer qualify your product without asking you. Put spec tables, photometric files and certificates at model level, and inquiries shift from "send me a price" to "can you build this project".
Price has stopped being a negotiating lever
Customs data for 2025 puts lighting exports at USD 49.9 billion, down 11.2%, roughly eight points worse than the previous year and the fourth consecutive annual decline. LED products accounted for USD 38.8 billion, or 77.7% of the total, up 2.6 percentage points from 2024. The LED share is rising while the value falls, which tells you the decline is in unit price, not in demand for the category.
The China Association of Lighting Industry's annual review adds two figures worth memorising. Export volume in 2025 was only 3% below the 2021 peak, but export value was more than USD 15 billion lower. LED bulb prices dropped from USD 1.29 to USD 0.46, and average prices across luminaire categories are roughly 40% below where they were ten years ago. The same container count now returns a third less money. Every point you concede at a trade fair comes back as a competitor's spec sheet on the buyer's screen.
The market mix is shifting at the same time. Exports to the US were USD 9.75 billion in 2025, down 23.4%, and the US share fell below 20% for the first time. Africa was USD 3.48 billion, up 4.1%, the only growing region. US tariffs on Chinese LED luminaires still run more than 25 points above those on Southeast Asian origins, and over 300 Chinese lighting companies have already set up capacity abroad. Buyers are not hunting for a cheaper supplier. They are replacing a supplier they cannot rely on.
Four gates a buyer walks through when switching suppliers
A switch makes the buyer far more thorough than usual. Four confirmations happen in sequence, and each one needs a page behind it. Miss one and the visit ends there.
| Gate | What the buyer confirms | Page that carries it | If it is missing |
|---|---|---|---|
| Specs | Do the photometric and electrical figures fit the project | Model-level spec table with units and test conditions | Thirty seconds, then back to search results |
| Files | Are IES/LDT, datasheets and installation drawings available | Technical download area with version and date | Becomes an email request; the thread dies |
| Compliance | Does the certificate cover this model and this market | Certificates listed by model and market | Sales spends two days proving it; interest is gone |
| Threshold | MOQ, lead time, after-sales boundary | A standalone cooperation terms page | The inquiry is just "price?" |
Compliance is the gate most sites skip. A row of CE, RoHS and UL logos that leads nowhere is decoration. What works is naming the models each certificate covers, the issuing body, the certificate number and the expiry date on one page. Get that right and your sales team stops writing three paragraphs of proof in every reply.
How detailed does a spec table need to be
The test is simple: can the buyer start comparing prices without asking a follow-up question. For LED luminaires, the table needs at least the fields below. Each missing field costs one more email round.
- Power and luminous flux on separate lines, with efficacy given as a range, commonly 120–160 lm/W. "High efficiency" is not a spec.
- Three colour temperatures: 3000K, 4000K and 5700K cover most requests, and each must map to specific models.
- CRI in two grades, 80 and 90, because project and retail work are not held to the same standard.
- Beam angle and optic type, tied to mounting height so the buyer can match the layout.
- Power factor above 0.9, with input voltage, frequency and driver brand in a separate electrical block.
- IP rating per product: IP65 outdoors, different values indoors. One rating cannot cover the catalogue.
- Two warranty tiers, three and five years, with the price gap explained rather than implied.
Units and test conditions beat ten lines of adjectives. A buyer who can place your table next to a competitor's and see the difference is a buyer who starts treating you as a spec option instead of a price quote.
Photometric files and certificates belong to models, not to the company
Project buyers want the IES or LDT file so they can run a DIALux calculation. If the file is not on the site, the deal stalls at "let me email them". Three rules make this work:
- One folder per model, holding the IES/LDT file, the PDF datasheet and the installation manual, named with model number and version.
- Show an update date. "v2, 2026-03" tells the buyer the model is still maintained.
- No gate. Trading an email address for a file is a penalty in project procurement, where the buyer wants to verify before contacting.
The same applies to images: a white-background shot, a real installation shot, and a dimensioned line drawing for every model. Installation shots must show mounting direction and light distribution correctly. AI-generated scene images are acceptable, but the fixture orientation and the light pattern have to be plausible, or an experienced buyer spots the composite immediately (see how we approach AI product scene images).
Six fields are enough on a project inquiry form
An inquiry form is not a CV. The more it asks, the fewer people finish it. Only six items actually change a project quote; everything else can wait for the reply.
- Project location and country, which decides certification and voltage version
- Application space: hotel, factory, car park or retail
- Series or model of interest
- Volume bracket, 100 / 500 / 2,000, not an exact number
- Required delivery window
- Mounting height, area or drawings, with file upload enabled
Past nine fields, completion drops visibly, and two weeks of testing on your own site will show it. The form also has to be measurable: submission confirmation, button clicks and popup triggers all need events (see contact popup inquiry forms).
Series, model, configuration: three layers that map to URLs
An LED catalogue splits into three layers, not one flat list:
- Series page covers shared housing, mounting direction and applications. It answers "what kind of fixture is this".
- Model page carries a specific SKU, with the spec table and files attached.
- Configuration (power, CCT, dimming) sits in a table on the same page, so nobody assembles a combination you do not build.
URLs should follow the same logic. A readable path such as /led-high-bay/150w-5700k/ indexes better than ?id=123 and can be pasted straight into a quotation email. Keywords should come from model and application long tails: "LED high bay 150W warehouse" is far less contested than "LED lighting supplier", the same principle we describe in B2B keyword research.
A realistic 90-day build order
- Weeks 1–2: the twenty models that make up 80% of shipments. Spec table plus files, finished properly, not spread thin across the catalogue.
- Weeks 3–4: certificates, cooperation terms and after-sales boundary. These three pages decide inquiry quality.
- Month 2: application landing pages for factory, car park and retail, each with two or three real projects.
- Month 3: use Search Console query data to fix model pages that get impressions but no clicks, starting with title and opening paragraph.
The order cannot be reversed. Application pages built before the spec tables bring traffic the site cannot hold, and rankings slide back on their own. The whole sequence serves one goal: the buyer has confirmed "this fits" before ever contacting you (see building a higher-converting B2B site).
FAQ
Does every model need its own page?
No. Models that share housing and mounting, differing only in power or CCT, belong on one page with a configuration table. Split them out only when the files or certificates differ.
Is publishing IES files risky if competitors copy them?
Photometric files exist for designers to use; hiding them costs inquiries. What competitors cannot copy is batch consistency and lead time, and those belong on the case and capacity pages.
Which certificate should we add first?
Follow your market. Europe first means CE and ERP; North America first means UL and DLC. Finish one market before claiming the next. Listing certificates you do not hold is a liability, not a shortcut.
Few inquiries: is it the site or the market?
Check two numbers. Do model pages get organic traffic, and does average time on page pass forty seconds. Traffic without dwell time is a page problem; no traffic is a keyword and indexing problem. Only when both fail is it the market.